5 Audley St, Mayfair ‐ London
Client: Caudwell Collection
Value: most prestige quality apartment in the UK
Current work demolition on site.
Value: most prestige quality apartment in the UK
Current work demolition on site.
New construction of high end residential luxury
apartments. Total area 30,000 sq.m. split over
12,000 sq.m. residential and 13,000 sq.m.
underground 5 floor basement.
Project completion 2022
Project Manager ‐ Arcadis
Project completion 2022
Project Manager ‐ Arcadis
120 Finchley Road
Client: Bravo Investment
Value: £20 million
Value: £20 million
110 units Appart hotel with lower 2-4 basement levels, commercial and offers space.
The lower basement w designed and constructed in a top down method allowing the upper floors to be built at the same time.
Total construction area 10,000 sqm to be completed October 2017.
The lower basement w designed and constructed in a top down method allowing the upper floors to be built at the same time.
Total construction area 10,000 sqm to be completed October 2017.
Westminster Park Plaza Hotel
Offshore funders and hotel
group, Red Sea Group
Value: £110m
group, Red Sea Group
Value: £110m
This 4/5 star hotel was constructed over a
three year period on a very difficult site
adjacent to Waterloo. It consists of 1150
bedrooms and 5 basement levels and a build
value of circa £120m. We acted as project
monitors for the funders and client with the
contractor operating on a construction
management basis. The design was carried
out in the UK and Israel.
ITC Tennis centre - Haifa
Client: ITC
Value: IS 2.8 million
Value: IS 2.8 million
3800 sqm of a cover tennis court using latest PTFA material technology.
Design Base Structures UK.
Design Base Structures UK.
Le Provençal Hotel ‐ Antibes, France
Client: Caudwell Collection
Value: not yet defined
Under construction + design
Value: not yet defined
Under construction + design
Extensive upgrading and remodeling of hotel to
form 29 luxury apartments split over 12,000
sq.m. residential, 5,000 sq.m car park and spa
space below ground.
Project Manager ‐ E C Harris/Arcadis
Project Manager ‐ E C Harris/Arcadis
Le Parc du Cap ‐ Antibes
Client: Caudwell Collection
Value: £100m
Value: £100m
New construction of high end residential
apartments. Total area 25,000 sq.m. split over
12,000 sq.m. residential and 13,000 sq.m.
underground car park.
Project completion ‐ December 2016
Project Manager ‐ E C Harris/Arcadis
Project completion ‐ December 2016
Project Manager ‐ E C Harris/Arcadis
Hotel Lutetia ‐ Paris
Client: Alrov
Value: €200m
Under construction
Value: €200m
Under construction
The magnificent hotel in central Paris on
Boulevard Raspail is converting into a high end
hotel - palace level with 240 new suites and 3
new basements under existing building.
Project completion ‐ May 2018
Project Construction ‐ Management Company ‐ Alrov
Project completion ‐ May 2018
Project Construction ‐ Management Company ‐ Alrov
Waldorf Astoria ‐ Jerusalem
Client: IPC ‐ Canadian
Reichmann Family
Value: £100m
Reichmann Family
Value: £100m
Advising client during concept, planning and
procurement of the new 223 bedroom hotel ‐
7th on the world list of hotels ‐ previously the
Palace Hotel built in 1920.